Which Properties in Your Industrial Portfolio Could Host Battery Storage?

Compare equipment size, grid connections, access and property rights to decide which Illinois industrial facilities deserve an initial battery-site review.

Published November 4, 2026
10 min read

Part 2 of GEC’s battery-storage land-lease series. Read Part 1: agreement and lease questions. Part 3 covers what happens from site review to operations.

Brief Read

Start with properties where batteries could fit alongside daily operations and future expansion. Tesla's approximately 1 MW example has an enclosure smaller than a 53-foot trailer. The installation also needs electrical equipment, access and required separations. Compare usable space, charging and discharge connections, local siting requirements and property rights before choosing a shortlist.

An industrial portfolio gives you several places to look: a side yard, an underused paved area or land beyond the active loading zone. The first task is to identify which areas the business could make available, then establish whether a battery project could work there. A front-of-meter ground lease makes space available for a third-party battery project serving the grid.

For agreement terms, payments and removal obligations, see Part 1: Battery Storage Land Leases for Illinois Industrial Owners.

How much space does a 500 kW or 1 MW battery need?

A power rating alone does not determine the space a battery needs. Tesla lists a four-hour, 979 kW system, approximately 1 MW, in an enclosure about 28.9 feet wide by 5.4 feet deep. The complete installation needs additional space for its connection equipment, working areas and access. Source: Tesla product details.

Three measurements help explain the differences between systems:

  • Kilowatts and megawatts (kW and MW) measure power: the rate at which the battery charges or discharges. One MW equals 1,000 kW.
  • Kilowatt-hours and megawatt-hours (kWh and MWh) measure energy. One MWh equals 1,000 kWh.
  • Duration describes how long a system supplies its stated power. Dividing energy by power gives a nominal duration, provided the ratings use a consistent basis. Usable output also depends on operating limits, losses and auxiliary loads.

NREL's battery-storage guide explains power, energy and duration, including the distinction between stored energy and usable output.

These published equipment examples make the scale easier to picture:

Published equipment examples, not installation layouts

Equipment example Power and energy Equipment dimensions and count
Illustrative combination of two CPS ES-250 blocks 500 kW and 1,118.2 kWh of stated battery capacity. CPS describes the blocks as two-hour systems. Four battery cabinets, each 51.2 × 51.2 inches at ground level, plus two power conversion system (PCS) cabinets, each 29.8 × 52.4 inches. CPS March 2024 datasheet.
Tesla four-hour Megapack configuration 979 kW and 3,916 kWh One integrated enclosure, 347 × 65 inches at ground level, or about 28.9 × 5.4 feet. Tesla product details.
Overhead plan of an illustrative warehouse, loading docks and parked trailers. A 53-foot trailer-body outline overlays the battery enclosure in the side yard; the next view enlarges that comparison.
An illustrative industrial facility, with the battery enclosure and trailer body drawn at the same scale as the building and docked trailers. The gold outline places a 53-foot trailer body directly over the battery location. The marked side yard is enlarged below. The building and site layout are fictional; this is a scale comparison, not an approved installation or lease boundary. Open the full facility plan.
Close-up of the same side yard: a 53-by-8.5-foot trailer-body outline overlays a Tesla enclosure measuring 28 feet 11 inches by 5 feet 5 inches. Both begin at the same corner; the enclosure is just over half the trailer body’s length.
At the same scale, the 53 × 8.5-foot trailer body overlays a Tesla enclosure measuring 28 feet 11 inches × 5 feet 5 inches. The four-hour Tesla example is rated at 979 kW and 3,916 kWh. This compares equipment bodies; the tractor and maneuvering space are excluded. The full battery installation also needs supporting electrical equipment, access and required separations. Sources: Tesla product details and Great Dane trailer dimensions. Open the full-size comparison.

The CPS combination is an illustration assembled from two published building blocks. Neither example is a GEC equipment selection or a proposed site layout. Cabinet dimensions leave out the gaps between equipment and the rest of the installation.

For a familiar reference, Great Dane describes a trailer measuring 53 feet long by 102 inches wide, or 8.5 feet wide. That is the trailer body only, without the tractor or maneuvering space. It helps you picture scale, but it does not establish a battery lease area.

Halving the power rating does not necessarily halve the equipment size. Tesla lists the same enclosure dimensions for its two-hour, 1,927 kW / 3,854 kWh configuration. Source: Tesla product details.

What else needs room around the batteries?

The property review should cover the permanent installation, continuing access and cable rights, and temporary construction space. These areas serve different purposes and need separate boundaries on the plan. A delivery or staging area might be needed only during construction, while a cable corridor could remain in use throughout operation.

Ask the project team to show:

  1. 1
    The full equipment arrangement. Include any external transformers, switchgear, metering and controls, plus service space, emergency access and required separations. Identify components already integrated into the battery equipment so they are not counted twice.
  2. 2
    The routes outside the equipment area. Trace cables to the connection point and show how utility crews and maintenance teams would reach the installation through the property's gates and security controls.
  3. 3
    The construction area. Mark delivery and lifting positions, staging, excavation and temporary work zones separately from the final operating area.

Equipment instructions and the applicable local review determine the layout and separations. Pacific Northwest National Laboratory's battery-storage zoning report documents differing approaches to setbacks, site plans and emergency access across jurisdictions.

What makes a utility connection worth investigating?

Nearby electrical infrastructure gives the project team a starting point for connection review. A storage project needs to take power from the grid to charge and deliver power when discharging. Review both directions, along with the proposed connection location and any required utility work, before treating a property as electrically suitable.

Ameren Illinois's hosting-capacity guidance explicitly directs standalone storage developers to its load and generation maps. Use the maps for an initial look. Their estimates do not reserve capacity, and Ameren still requires engineering review. System modifications could affect connection costs.

For ComEd properties, use the DER Interconnection Requirements effective September 14, 2026. The document addresses connection studies, site information and access. Required application materials depend on the project type and proposed connection.

The regional market framework also differs by utility territory. ComEd directs applicants seeking wholesale participation to PJM. Ameren Illinois's transmission facilities are in MISO. For municipal or cooperative service areas, identify the actual serving utility before assigning a process. Utility connection review and wholesale participation have separate requirements.

Can the battery fit without disrupting the facility?

Have the facility team mark the candidate area on the same plan as truck routes, dock approaches, parking and emergency access. Include peak activity and seasonal uses. This gives the project team a practical starting point for placing equipment while preserving the space your business or tenant needs to operate.

A yard that looks empty in an aerial image might hold trailers during a busy shift or snow in winter. Walk the area with someone who knows the site. Check turning and queuing movements, pedestrian routes, service access and security boundaries.

Review parking requirements and tenant use before treating a lightly used parking area as available. Add planned building extensions, fleet charging, solar and other reserved improvements to the drawing. Keep those plans visible even if their construction dates are undecided.

Which ground conditions and local requirements need review?

Identify grade changes, drainage paths, stormwater facilities and known flood exposure before settling on a candidate area. Give the design team enough information to assess grading and foundations. Check whether delivery vehicles and lifting equipment could reach the proposed location, including through entrances and around buildings.

Keep retention and drainage areas marked for their existing purpose. Where floodway or floodplain questions arise, establish the applicable review with the civil team and local authority. Illinois DNR's permit guidance describes requirements and exceptions that vary with location and the proposed work.

Ask the municipality or county which siting process applies to the proposed battery system. Include the fire authority early enough to account for emergency access and separation requirements. Noise, visual screening and neighboring uses also belong in the layout discussion. PNNL's zoning report provides context for these questions, while the property's jurisdiction determines the local requirements.

Who controls the proposed area and access routes?

Confirm who has authority over the candidate area, the cable route and the access needed to build and operate the project. At a tenant-occupied facility, compare those areas with the tenant's lease and operating rights. Involve the property and legal teams while the layout is still flexible.

Include existing easements and solar agreements in that review. For an owner-operated plant, coordinate with the people responsible for production, maintenance and future capital projects. Document any approvals or agreement changes the proposed use would need. Part 1 covers property and lease responsibilities.

How should you compare several facilities?

Use one worksheet row per property, supported by a marked site plan or aerial. Track physical fit, utility review, local siting and property control separately. Record what is known, what remains unknown and who will resolve the next question. This makes the shortlist useful without treating an early screen as project approval.

A first record for each property

Record for each property Useful first entry
Address and serving utility Confirmed utility name, or unknown
Candidate area Approximate dimensions, shape and current use
Operating and expansion needs Annotated truck routes, parking, drainage and reserved areas
Electrical information Existing drawings, solar details and any utility study, with its date
Local review and property rights Jurisdiction, relevant agreements and the person handling each question
Next action Worth initial review, clarify a specific issue, or reserve for later, with a reason and responsible reviewer

For your internal shortlist, use worth initial review when the facility team can identify an area to explore without a known conflict with operations or planned expansion. Use clarify a specific issue when a question about use, access or property control could change that decision. Use reserve for later when the business needs the space for another purpose. These labels organize the next investigation. Keep utility capacity, local review and developer interest recorded separately, including what remains unknown.

Keep a map observation separate from a completed utility study. A smaller area with workable access deserves consideration alongside a larger area with unresolved operating conflicts. Ask the developer whether its project concept and commercial requirements fit the properties you have identified.

Start with the information available. Detailed technical records can follow as the connection and operating concept become clearer.

Frequently asked questions

Is there a minimum acreage for a battery ground lease?

An acreage figure alone is not enough to screen a property. Ask for the selected system's complete layout, including supporting electrical equipment, access and separations. Then identify continuing rights and temporary construction space. A developer's minimum site criterion applies to its project concept, not every battery installation.

Does a nearby substation make a property suitable?

It is a reason to investigate the connection. Suitability still depends on charging and discharge capacity, the connection route and required utility work. For an Ameren Illinois property, start with both hosting-capacity maps, then distinguish those preliminary findings from the project's utility review.

Can a property with rooftop solar also host a battery?

Include it in the initial review. Provide the solar system's electrical information and relevant agreements so the team can assess the proposed battery alongside the existing installation. Rooftop solar does not establish spare grid capacity, and the battery's connection and operating arrangement still need to be defined.

Would a hosted battery lower the tenant's bill or provide backup?

A front-of-meter ground lease does not automatically provide either benefit. Bill savings and backup require an electrical design and commercial arrangement serving the facility. If either is a goal, identify the loads to serve, dispatch control and intended outage operation. Part 1 explains this distinction.

What is enough information to start a portfolio review?

Begin with addresses, utility names if known, marked candidate areas and brief notes on operations and expansion. Include existing electrical or solar drawings and utility studies you already have. Identify a facility contact who knows the property. The next request should follow the questions raised by that first review.

For an initial conversation about battery storage, bring GEC your shortlist, candidate areas and known operating needs. Start with the properties you know best, even if some of the electrical or site information still needs to be gathered.

Discuss battery-site options for your industrial portfolio.

How this guide was made: Prepared with AI assistance using public manufacturer, utility and government sources. Equipment examples illustrate published specifications, not equipment selection or engineering approval.

About the Author
Drew Mays
C&I Solar & Energy Strategy Advisor

C&I solar and energy strategy advisor. Founder of Envision Energy Solutions and Vice President of C&I Energy Solutions at General Energy Corporation, an engineering-first EPC founded in 1985.